about DOS and PDOS calculations

Queries about input and output files, running specific calculations, etc.


Moderators: Global Moderator, Moderator

Locked
Message
Author
gloomy2004

about DOS and PDOS calculations

#1 Post by gloomy2004 » Fri Sep 02, 2011 11:27 pm

I think there should be 2 ways to get DOS and PDOS. one is to set up RWIGS in INCAR, the other is to set up parameter LORBIT=11. am i right?

I have tried both of two ways, but get differnt PDOS curve. so does it beacuse of bad RWIGS set-up? i gave RWIGS according to POTCAR file. Thanks a lot.
Last edited by gloomy2004 on Fri Sep 02, 2011 11:27 pm, edited 1 time in total.

support_vasp
Global Moderator
Global Moderator
Posts: 1817
Joined: Mon Nov 18, 2019 11:00 am

Re: about DOS and PDOS calculations

#2 Post by support_vasp » Thu Sep 12, 2024 8:22 am

Hi,

We're sorry that we didn’t answer your question. This does not live up to the quality of support that we aim to provide. The team has since expanded. If we can still help with your problem, please ask again in a new post, linking to this one, and we will answer as quickly as possible.

Best wishes,

VASP


Locked